top of page
CIM Corrosion Integrity Management logo

Internal Lining to Water Pipeline

A 200km, 36 inch pipeline with an FBE internal lining showed defects before construction was complete. CIM's job was to identify the root cause of failure and the potential corrosion risks once commissioned. 

​

​Internal pipeline Coating failure requires specific knowledge of Linings and their application. CIM working alongside world leading Pipeline Engineers are able to investigate, identify root cause and offer corrosion management solutions to end of life.​ The solutions often rely on what is practically possible. Facilitating working groups is an essential requirement.

Internal Lining to Water Pipeline - Corrosion Integrity Management
bottom of page