top of page
CIM Corrosion Integrity Management logo

Coating Failure Petrochemical Plant

Corrosion Integrity Management were asked to evaluate the root cause of failure on a Petrochemical Plant. The owner/operator had put the failure down to poor construction practices but it became evident there were other factors at play. CIM and its assocaite engineers identified that the specification of the application of the corrosion protection system met all the requirements in full. The root cause was from unidentified processes within an adjacent plant.

 

The report was completed in record time and offered a number of alternative arguments to that positioned by the client. The case was brought to Tribunal and CIM successfully defended the Engineering House. The Lawyer wrote: “Please see attached the Tribunal’s determination with respect to the painting claim. You will see that the Engineering House was successful in fully defending the Owner Operators defect claim, which was dismissed in full. Your help in achieving this result has been invaluable. We hope to work together again in the future.“. The claim was defended based on a highly detailed evaluation of the facts, practical knowledge of industry and a simple response to the Respondents highly complex Expert submissions. The Tribunal could understand Mr Mobbs submission based on simple facts delivered succinctly.​

Coating failure at petrochemical plant - Corrosion Integrity Management projects
bottom of page