top of page

Failure Analysis

  • A Polyurea Floor had given performance as expected over 95% of an application in the UK. A small area showed signs of blistering and CIM were asked to establish the root cause.

​

  • A detailed study of the facts, a site evaluation and laboratory testing concluded there must be a defect in the vapour barrier

​

  • A simple solution was offered based on practical knowledge and a clear understanding of the facts

© 2020 Corrosion Integrity Management

bottom of page